Traditional Felt on Bath's Older Properties

The majority of Bath's Victorian and Edwardian housing stock has traditional bitumen sarking felt under the Welsh slate — typically laid during a 20th-century re-roofing that replaced the original close-boarded sarking of the Victorian period. This felt has an expected service life of 30 to 60 years and is now at various stages of its useful life depending on when the re-roofing was done. On properties re-roofed in the 1960s and 1970s, the felt is now 50 to 60 years old and may be brittle or perished in sections.

British Standard BS 5534: British Standard BS 5534 specifies underlay requirements including the support and lap needed at the eaves — the point where perished sarking felt on older Bath roofs most commonly fails.

Signs That Sarking Felt Has Failed

Failed sarking felt shows in the loft space as: large tears or holes visible from below; sections that have detached from the battens and are hanging down; areas of extreme brittleness that crumble when touched; and water staining on the felt surface without obvious active tile failure that would explain the water entry. On steep-pitched Victorian Bath roofs, inspecting the felt from the loft is straightforward and should be part of any condition survey.

The Breathable Membrane Upgrade

Why Breathability Matters in Bath

Bath's valley and canal corridor microclimates create above-average ambient humidity in roof spaces. Traditional bitumen felt, being vapour-impermeable, traps this moisture in the roof void. Combined with modern loft insulation at ceiling level — which reduces the air temperature above the insulation, increasing the dew point — this creates conditions for condensation on the felt surface. Breathable membrane allows moisture vapour to pass through to the atmosphere, substantially reducing condensation risk.

The Building Regulations Position

Current Building Regulations (Approved Document C) require low-resistance vapour-permeable underlay (breathable membrane) on new roofs and re-roofs where the underlay is fixed immediately below the tile or slate without a 25mm ventilated air space above it. For the majority of Bath re-roofing projects — close-tiled or close-slated without an air gap — breathable membrane is the regulatory requirement.

Felt Replacement During Re-Roofing

Sarking felt is replaced as an integrated part of any full re-roofing project in Bath. The tiles or slates are stripped, the felt and battens are removed, the roof structure is inspected and any timber repairs are made, new breathable membrane is installed on new treated battens, and the tiles or slates are re-fixed. The membrane is never an optional extra — it is included as standard in every Bath re-roofing specification.

Questions about sarking felt or roof underlay on your Bath property? Call 0122 528 7924. Free assessment, breathable membrane specified correctly as standard.